製品変更通知
| Change Notification # |
|
10135 |
| Revision |
|
|
| Type of Notification |
|
PRODUCT/PROCESS CHANGE NOTIFICATION |
| Change Title |
|
Assembly/Test Site Change from Motorola KLM to Tesla Seznam, Czech Republic |
| Issue Date |
|
2000-02-10 |
| Affected Product Family |
|
DISCRETES AND LOGIC |
| Description |
|
ON Semiconductor is qualifying the Tesla Sezam assembly site in Rosnov, Czech Republic to process 5 lead T0-220 insertion mount and 5 lead D2T surface mount packages to meet growing business needs and additional capacity requirements. Tesla is already qualified on the 3 lead versions of these packages and the 5 lead devices will be processed using the same equipment. The 5 lead TO-220 and D2T process is being transferred from Motorola's KLM facility with no changes. There will be no change to the function of the devices being transferred. Device parameters will continue to meet all databook specifications and reliability will continue to meet or exceed ON Semiconductor standards.
|
| Key Items Affected by Change |
|
On Semiconductor Assembly Site, Subcontractor Assembly Site, On Semiconductor Test Site, Subcontractor Test Site |
| |
| Key Milestones |
|
| Effective Date: |
|
2000-04-11 |
| Sample Info: |
|
Contact your local ON Semiconductor Sales Office. |
| Possible Replacements |
|
N/A |
For more information on this Process Change Notification, please
contact your local ON Semiconductor sales office.
|
|