NCP81239REFGEVB: USB Power Delivery 4 Switch Buck Boost Controller Evaluation Board

The NCP81239REFGEVB USB Power Delivery (PD) Controller Evaluation Board is a synchronous buck boost that is optimized for converting battery voltage or adapter voltage into power supply rails required in notebook, tablet, and desktop systems, as well as many other consumer devices using USB PD standard and C-Type cables. The NCP81239REFGEVB is fully compliant to the USB Power Delivery Specification when used in conjunction with a USB PD or C-Type Interface Controller.

This board is designed to be used with the NCP81239LOADGEVK

特長およびアプリケーション

特長

  • Slew rate control during transition
  • I2C interface
  • 4.5 V to 28 V operating range
  • Switching frequency from 150 kHz to 1200 kHz
  • Supports USB-PD, QC2.0, and QC3.0 profiles
  • Overvoltage and overcurrent protection

利点

  • Allow easy implementation for USB-PD specification
  • Allows for uC to interface to device to meet USB-PD power requirements
  • Wide operating range for various applications
  • Optimize efficiency and size trade-off

アプリケーション

  • USB Type-C
  • Computing
  • Point of Sales
  • Consumer
  • USB PD
評価/開発ツール情報
製品 状態 Compliance 簡単な説明 使用パーツ アクション
NCP81239REFGEVB
USB Power Delivery 4 Switch Buck Boost Controller Evaluation Board NCP81239MNTXG NTTFS4C06NTAG
NTTFS4C13NTAG
技術文書
タイプ ドキュメント・タイトル ドキュメント ID/サイズ 修正
Eval Board: Test Procedure NCP81239REFGEVB Test Procedure NCP81239REFGEVB_TEST_PROCEDURE - 351 KB  0 
Eval Board: BOM NCP81239REFGEVB Bill Of Materials (ROHS Compliant) NCP81239REFGEVB_BOM_ROHS.pdf - 122 KB  2 
Eval Board: Schematic NCP81239REFGEVB Schematic NCP81239REFGEVB_SCHEMATIC - 354 KB  0 
Eval Board: Gerber NCP81239REFGEVB Gerber Layout Files (Zip Format) NCP81239REFGEVB_GERBER.zip - 1207 KB  2 
Video USB Power Delivery 4-Switch Buck Boost Controller Evaluation Kit - NCP81239LOADGEVK WVD17638/D   
過去に閲覧した製品
一覧をクリアする

特集ビデオ
USB Power Delivery 4-Switch Buck Boost Controller Evaluation Kit - NCP81239LOADGEVK
Your request has been submitted for approval.
Please allow 2-5 business days for a response.
You will receive an email when your request is approved.
Request for this document already exists and is waiting for approval.